Back to Projects
Infographic of the six-stage community water system: intake, pump house, sedimentation tank, slow sand filter, chlorination unit and underground clear water tank
Featured

Community Water System Project

Status
Active
Location
Ghana
Timeline
Since September 2026
Pillar
Water & Sanitation
Beneficiaries
1,500
Funding goal
GHS 250,000

A six-stage community water system (intake, pumping, sedimentation, slow sand filtration, chlorination and covered storage) that brings safe drinking water to rural families.

Clean Water · Healthy Families · Sustainable Communities

The Community Water System Project brings safe, treated drinking water to rural households. Water is drawn from an underground source and passes through six stages before it reaches the community.

Infographic of the six-stage community water system: ground water intake, pump house, sedimentation tank, slow sand filtration unit, chlorination unit and underground clear water tank
How the community water system works, stage by stage

How the system works

  1. Ground Water Intake: Captures water from the underground source through a protected intake structure with a screen to prevent debris.

  2. Pump House: A submersible or surface pump lifts water from the ground to the sedimentation tank with adequate pressure for the system.

  3. Sedimentation Tank: Allows suspended solids and silt to settle at the bottom, reducing the turbidity of the water.

  4. Slow Sand Filtration Unit: Removes remaining fine particles and microorganisms and improves water clarity using layers of sand and gravel.

  5. Chlorination Unit: Disinfects the water by adding a safe level of chlorine to eliminate harmful germs and bacteria.

  6. Underground Clear Water Tank: Stores treated water in a clean, covered underground tank for safe and continuous distribution to the community.

Explore the system in 3D

Why it matters

Reliable clean water cuts waterborne illness, frees children (most often girls) from long walks to fetch water, and gives families time back for school and work.

Safe water for a brighter future.

Visual Stories
From the field

Events & Progress

  1. Event

    Water system commissioning day

    Project site, Ghana

    Join us as we commission the community water system and open the first public tap.

    Infographic of the six-stage community water system: intake, pump house, sedimentation tank, slow sand filter, chlorination unit and underground clear water tank
  2. Progress report

    Progress report: Q3 2026

    Intake, pump house and sedimentation tank are complete; filtration, chlorination and storage are next.

    Infographic of the six-stage community water system: intake, pump house, sedimentation tank, slow sand filter, chlorination unit and underground clear water tank

Help us make Community Water System Project happen

Every gift goes straight to the work on the ground. Give once or get involved with our team.